Dagley Lane bridleway resurfacing complete

The Dagley Lane resurfacing of the Bridleway is complete with funding obtained as part of the EATF Tranche 2. The surface is a bound, all-weather surface to allow all-weather cycling between Shalford and Guildford without using the main road. The path between the bridleway and Shalford Thames Water Depot will be upgraded soon.

Dagley Lane resurfacing completed Summer 2022

Leave Comment

Your email address will not be published. Required fields are marked *